 |
 |
Step 1. Rolling the tubes. 22 pieces, in 6 different radii. |
| Greg setting up one of the strut pieces to be welded. |
 |
 |
Vince TiG welding the struts together at the center hub assembly. |
| A Semi-circle of supports ready for the tubes to be installed. |
 |
 |
The first few tubes tack welded in place. |
| Vince putting the final welds on the tubes. |  |
 |
Greg cutting the excess tubing from one of the semi circles. |
| A close up of one of the welded joints, where the tubing fits into the support. |
 |
 |
Greg and Vince standing with their masterpiece. |
| Greg and Vince with the toroid in the vertical position. |
 |